Enter a property address
Type an address in your state, or click a dot on the map.
Every comp is real and mapped, never made up. Get proof for each determination, backed by 24 CFR 982.507.
Your portal runs the nine-station tenancy approval pipeline. Rent reasonableness — this product — is Station 4 inside it.
Select your state and housing authority in the sign-in card. Everything below is computed from HUD VMS utilization data — there is nothing to type and nothing to adjust.
Steps 1–4 are the limited public demo, running on the same live registries your staff would use. The product itself — the rent reasonableness determination, the full case file, RFTAs, inspections, 50058 pre-checks and HAP assembly — lives in your authority’s own portal, scoped to your jurisdiction, your payment standards and your caseload.
Every case moves through the nine tenancy-approval stations with an audit trail a HUD reviewer can follow.